  • This training document is a Rego Consulting Quick Reference Guide to assist with the staffing of a Team on an investment in Clarity’s Modern User Experience.  This doc references version 16.3 views. Doc covers Common Terms, setting up a Default Allocation, Allocation vs ETC, Staff Tab, and Staffing the Team – Time Scale.
  • This training document is a Rego Consulting Quick Reference Guide to assist with Allocations Timeline in Clarity’s Modern User Experience.  This doc reviews the Investment Timeline and the Resource Histogram sections of the Allocations Timeline.
  • Rego’s Clarity Adoption Metrics package consists of two sets of metrics: Project metrics, and Resource metrics. Project metrics measure how effectively project managers are using Clarity to manage their projects. Resource metrics measure how effectively resource managers are using Clarity to manage resources. Metrics are scored on a scale of 0 to 5, with higher scores indicating greater adoption and use. All metrics can be viewed numerically or graphically, and can be broken out by OBS. In addition, metric data can display as a 12-month rolling history to help identify trends. Project metrics can also display by lowest / highest adoption rates for a specific resource metric or all resource metrics. There is a variety of way to view the Adoption Metric data, therefore, Rego has made this simple by creating an Adoption Metrics object that contains multiple tabs.  Each tab displays one or more of the Project or Resource Adoption Metrics.  Based on the nature of the Metrics some tabs will allow the ability to use a pull down menu to select a specific Adoption Metric.   There is also a Metrics trending view that pulls monthly snapshots of the metrics. Project metrics consist of the following:
    • Project Status Reporting – Measures how well PMs create and publish project status reports.
    • Project Risk Adoption – Measures how well Risks are being used and managed.
    • Project Issue Adoption – Measures how well Issues are being used and managed.
    • Project Schedule – Measures how well PMs create tasks and keep the project schedule current.
    • Project Baseline – Measures whether or not baselines exist.
    • Project Zero ETC’s – Measures how well the PM assigns resources to tasks with ETCs.
    • Project Past ETC’s – Measures how many improperly scheduled tasks the PM has.
    • Project Milestone / Key Tasks – Measures how well PMs create and manage Milestones / Key Tasks.
    • Project Schedule Variance – Measures how effectively PMs manage their schedules.
    • Project Effort Variance – Measures how effectively PMs manage their project efforts.
    • Project Budget Variance – Measures how effectively PMs manage budgets or cost plans.
    • Project Unfilled Roles – Measures project roles with allocations that are already started or starting within the next 30 days.
    • Project Data Quality – Measures how effectively PMs complete the Description, Stage, Progress, Objective, and Sponsor/Business Owner fields.
    • Project Commitment – Measures the hard allocations for a project over a two week time frame.
    Resource Metrics consist of the following:
    • Resource Clarity Usage – Measures how often users log into Clarity.
    • Resource Timesheet – Measures if timesheets post in a timely manner.
    • Resource Allocation – Measures how well RMs keep total resource allocations within the expected range for future time periods.
    • Resource Actualy Utilization – Measures how well Resource allocations match actuals.
    • Resource Allocation Date in the Past – Measures how many resources are open for time entry with dates in the past.
    • Resource Data Quality – Measures how well RMs complete the Resource Manager and Primary Role fields and optionally the Skill and Employment Type fields.
    • Resource Commitment – Measures how much resource available time is committed to projects.
  • You are no longer regulated to the desktop browser to respond to action items.  Learn how Rego solved this problem using just your email.  We’ll talk about various use cases where you would get maximum benefit from a simple response on an action item directly from your email. It doesn’t matter if you are using email on your desktop, laptop, phone or tablet. The Action Item Responder as you covered.
  • This training document is a Rego Consulting Quick Reference Guide to assist with creating and management of a project team in Clarity’s Modern User Experience.  The document reviews accessing teams, creating a team, allocating a team on an investment, as well as additional team related information.
  • The Enhanced Time Tracking Stalker – Resource workflow process is used to notify resources who failed to submit a timesheet for the prior time period they must take action. The workflow checks for active resources (by using the hire and termination dates, their track mode and that they are open for time entry). Each resource who meet the criteria receives an email asking them to submit their outstanding timesheet(s). The email includes a table that contains this information: time period, timesheet status and any hours currently saved on the timesheet. All outstanding timesheets are included in the table with links to the timesheet in the Modern User Experience side of Clarity. This process helps to ensure the timely submission of timesheets.
  • This training document is a Rego Consulting Quick Reference Guide to assist with Task Assignments in Clarity’s Modern User Experience.  This doc references version 16.1 views.  Document provides detail on how to use the Assignments tab to add resources to tasks, tips on how to group resource data, updating ETC values and Per-Period Metrics.
  • This training document is a Rego Consulting Quick Reference Guide to assist with creation and management of resource Teams in Clarity’s Modern User Experience.  This doc references version 16.3 views. Document provides detail on how to create Teams and add resources to a Team. Instructions are provided on how to add resources by OBS and how to allocate a team to an investment. Team key points are provided with regard to Classic, Allocations, ETC and Financials.
  • Does your organization struggle with resource management? Have you considered creating a Resource Management Office (RMO)? Do you struggle with a lack of executive sponsorship to drive adoption? This session will review how some organizations are succeeding in driving adoption and effectively manage resources through engaging leadership, RMOs, and using more dedicated resources. Learn about some best practices for driving effective resource management across your organization.
  • The primary purpose of roles is to determine the amount of resource requests based on unapproved (uncommitted) and approved (committed) projects. Roles are non-named resources which are later allocated to named resources within CA PPM. Using roles is the best way to do "What If" scenario planning and determine needed capacity.  This document assists in making Best Practice decisions around setting up roles in Clarity.
  • ** No Download -  Do not Add to Cart** - Register for the White Paper at this link - http://info.regoconsulting.com/create-rmo-that-works-2020 Is your organization struggling to make sure you have the right people working on the right initiatives to meet your objectives? If so, you’re not alone. In this white paper, Rego’s Grant Zemont provides insight on what your company can do to create an RMO to get you pointed in the right direction for success.
  • To effectively practice Agile at scale, Clarity teams first need to identify various needs. This includes thinking through considerations for funding, investment prioritization, and spend management practices.
  • This training document is a Rego Consulting Quick Reference Guide to assist with General Navigation in Clarity’s Modern User Experience.  This doc references version 16.1.2 views.  Doc reviews the Menu Bar and User Tool Bar.
  • This training document is a Rego Consulting Quick Reference Guide to assist with Allocations Timeline in Clarity’s Modern User Experience.  This doc reviews the Investment Timeline and the Resource Histogram sections of the Allocations Timeline.
  • This training document is a Rego Consulting Quick Reference Guide to assist with resource staffing in Clarity’s Modern User Experience.  The document reviews accessing Staffing from the main menu, the Staffing Grid, and the Allocations Timeline.
  • This training document is a Rego Consulting Quick Reference Guide to assist with the Resources Workspace in Clarity’s Modern User Experience.  This doc references version 16.2.1 views. Document reviews the Resources, Roles and Teams tabs in the Resources Workspace.
  • This training document is a Rego Consulting Quick Reference Guide to assist in the replacement of roles with named resources in Clarity’s Modern User Experience.  This doc references version 16.1.2 views. Document provides detail on soft bookings, default allocation and requested manager. Instructions are provided on how to access requests from the Staffing Plan view and how to swap the role for a named resource. If requests are not fulfilled in their entirety, details are provided on how the excess allocation is handled.
  • This training document is a Rego Consulting Quick Reference Guide to assist with creation and management of resource Teams in Clarity’s Modern User Experience.  This doc references version 16.1.2 views. Document provides detail on how to create Teams and add resources to a Team. Instructions are provided on how to add resources by OBS and how to allocate a team to an investment. Team key points are provided with regard to Classic, Allocations, ETC and Financials.
  • A process creating a new Cost Plan. Cost Plan properties:
    Name Cost Plan created on: yyyy/mm/dd hh:mm:ss
    Grouping attributes Charge Code, Transaction Type
    Start Period The earliest fiscal period with Actuals (from PPA_WIP table) or current period, if there are no actuals
    Finish Period The latest fiscal period with a non-zero allocation (from PRJ_BLB_SLICES table, SLICE_REQUEST_ID = 6
    Period Type Monthly
    Plan of Record True
    Planned Cost For periods in the past – from Actuals (Charge Code, Transaction Type, Quantity (Units), Cost (Amount) taken from Transactions (PPA_WIP & PPA_WIP_DETAILS); For current and future periods – from Allocations (Charge Code taken from the Project, Transaction Class from the Resource, Quantity from allocation slices, Cost from the Rate Matrix (NBI_PROJ_RES_RATES_AND_COSTS table)
    Pre-conditions:
    • the Project must be financially enabled.
    • if a new Team Member is added, Rate Matrix job must be run, so the rates are populated in the NBI table.
    • if the Allocation changes, allow the timeslice job to finish before running the process.
    • the Project should have the Charge Code set.
  • The Enhanced Time Tracking Stalker – RM workflow process automatically sends a single email to Resource Managers which contains a list of any of their resources that have not submitted their timesheet for a prior open time period.  The email informs the RM if their resources are submitting their timesheets on time.  The email includes a table that provides this information for each resource: Resource Name, Time Period, Timesheet Status and Total Hours saved on the timesheet with links to the timesheet in the Modern User Experience of Clarity. These notifications will help to ensure that time is being posted and approved in a timely manner.
  • The Timesheet Audit portlet displays timesheet information in order to perform an audit.  The only required data needed to search the portlet is start and finish date. Additionally, you may narrow the results by filtering by resource, resource ID, OBS Unit, resource manager, timesheet status, project, and task. The portlet provides reporting on the following:
    • Resource
    • Resource ID
    • Email Icon of Resource (So the reviewer can quickly email the Resource)
    • Resource is Active
    • Resource Open for Time
    • Time Period (Start and Finish Dates)
    • Timesheet Status
    • Is Adjustment (If the timesheet is adjusted)
    • Timesheet Modified Date
    • Timesheet Posted Date
    • Timesheet Submitted By
    • Timesheet Approved By
    • Project
    • Task
    • Proposed ETC Hours
    • Pending Actual Hours
    • Total Actual Hours
  • This training document is a Rego Consulting Quick Reference Guide to assist with the adding of resources to the Staff tab for Ideas in Clarity’s Modern User Experience.  This doc references version 16.3 views. Document provides detail on how to add resources to the Staff tab, Default Allocation % and Per-Period metrics.
  • This training document is a Rego Consulting Quick Reference Guide to assist in the replacement of roles with named resources in Clarity’s Modern User Experience.  This doc references version 16.2.1 views. Document provides detail on soft bookings, default allocation and requested manager. Instructions are provided on how to access requests from the Staffing Plan view and how to swap the role for a named resource. If requests are not fulfilled in their entirety, details are provided on how the excess allocation is handled.
  • This training document is a Rego Consulting Quick Reference Guide to assist with creation and management of resource Teams in Clarity’s Modern User Experience.  This doc references version 16.2.1 views. Document provides detail on how to create Teams and add resources to a Team. Instructions are provided on how to add resources by OBS and how to allocate a team to an investment. Team key points are provided with regard to Classic, Allocations, ETC and Financials.
  • This training document is a Rego Consulting Quick Reference Guide to assist with the adding of resources to the Staff tab for Ideas in Clarity’s Modern User Experience.  This doc references version 16.2.1 views. Document provides detail on how to add resources to the Staff tab, Default Allocation % and Per-Period metrics.
  • This training document is a Rego Consulting Quick Reference Guide to assist with General Navigation in Clarity’s Modern User Experience.  This doc references version 16.2.1 views.  Doc reviews the Menu Bar and User Tool Bar.
  • Traditional project management isn’t dead, but it is heavily influenced by Agile teams and thinking. This course looks at ways you can help bring together disparate delivery units across the enterprise.
  • This training document is a Rego Consulting Quick Reference Guide to assist with the process of staffing a Team in Clarity’s Modern User Experience.  The document starts with a review of common terms, then setting default allocation, Allocation vs ETC, and then the Staffing Tab.
  • ** No Download - Do not Add to Cart ** Join Rego expert guide Dave Gubeno, Will Ross, and Chris Phillips for an engaging and informative webinar that will explain the definition, purpose, and development of Clarity metrics. Their discussion will also include: A description of the differences between metrics and key performance indicators An introduction to the Rego Adoption Metrics Framework lifecycle The presentation of pre-defined Rego Adoption Metrics for Projects and Resources An introduction to a set of Clarity portlets used to view the metrics http://info.regoconsulting.com/clarity-adoption-metrics-september-2020
  • View Rate Matrix is a grid portlet that provides users a single place to view all the rates defined across multiple rate matrix without going to administration tab. Each Matrix may be defined with different columns (ex: Charge Code, Client, Department, Entity, Input type Code etc). This portlet dynamically brings only the columns associated with that rate matrix and provides the detailed information. User can view information related to one matrix at a time.
  • View Rate Matrix is a grid portlet that provides users a single place to view all the rates defined across multiple rate matrix without going to administration tab. Each Matrix may be defined with different columns (ex: Charge Code, Client, Department, Entity, Input type Code etc). This portlet dynamically brings only the columns associated with that rate matrix and provides the detailed information. User can view information related to one matrix at a time.
  • Have you looked in the regoXchange or reviewed Rego’s innovation offerings? This class will show you the power of Rego’s pre-built content library, integrations, and other assets. See example after example of portlets, processes, and materials you can use to add value to your instance of Clarity.  Learn how you can introduce email-based approvals with Rego's action item responder.  Get a peek at Rego's new MSP integration that avoids the issues faced with the OOTB integration.  Finally, understand Rego's pre-built connectors and how they can benefit your instance.  Including blueprint migrator.  Include free tools like GEL builder, query, XOGbridge.
  • A presentation slide deck from RegoU 2024. This course focused on an itDesign product that adds-on to Clarity for Resource Management enhancement.
  • This training document is a Rego Consulting Quick Reference Guide to assist with Staff Grid in Clarity’s Modern User Experience.  This doc references version 16.2.1 views. Document provides detail on the use of the Staff Grid in the Staffing Modules in the Common Component functionality.
  • The portlet displays posted time by project for the logged in user based on time period and date range.  This allows the user to see at a glance their ETC and actuals on the projects. The portlet displays the Total Allocation and Total Actuals to Date for the user on the projects they are allocated/assigned to.  The actuals are displayed per month in the form of TSVs.
  • This training document is a Rego Consulting Quick Reference Guide to assist with the Staffing Plan.  The document reviews accessing the Staffing Page, viewing Resource Allocations, adding Allocations, and the Staff Tab Legend.