  • Ideas by Department report is a pie chart that displays count of ideas by department. Mouse over on the pie chart displays idea count for that department. You can further narrow your search by OBS Type & Path , Idea Status, Idea Start Date and  Is Idea Active?.
  • Pending Actuals report provides the Project Managers a single place to view all the pending actuals on tasks across multiple projects. User can view only the projects that he has access to.  Managers can use this portlet to analyze the actuals that have been submitted but not posted on tasks.  You can further narrow your search by OBS Type & Path and Assignment Total.
  • Project Budget vs Planned vs Actual by Month report provides the Project Managers a single place to view Project Budget, Planned and Actual Cost for multiple projects. Project Managers can use this view to compare various costs for that project in a particular month. User can further narrow their search by OBS Type & Path, Is Project Active?, Fiscal Month Start Date, Investment Manager and Investment Name.
  • Time by Investment report displays time spent by resources on investment(s). User can view only the investments that he has access to view. Information can be drilled to Yearly, Quarterly or Monthly level. User can further narrow their search by OBS Type & Path, Investment Name, Month Start Date and Is Project Active?.
  • Project Cost within Budget report displays count of projects that are within or exceeding budget in the form of a pie chart. This report provides management a graphical representation of cost status on all projects. Mouse over on the pie chart displays count of projects for that category. You can further narrow your search by OBS Type & Path, Project Manager, Project Status, Project Stage, Program Name, Is project Active? And Is Template?.
  • Time by Stage and Timescale – Graph report is a stacked column chart that displays hours for all tasks on projects by their stage for a user-defined time period. Using this report, Management can determine if excess time is being spent on a certain task stage within a project You can further narrow your search by Month Start Date, OBS Type & Path, Is Project Active? And Is Template?
  • Time by Stage and Timescale – Grid report displays hours for all tasks on projects by their stage for a user-defined time period. Information can be drilled down to Year, Quarter or Monthly level. Using this report, Management can determine if excess time is being spent on a certain task stage within a project You can further narrow your search by Month Start Date, OBS Type & Path, Is Project Active? And Is Template?
  • Time by Assignment report displays time logged to assignments and its associated actuals on monthly basis for all filtered investments. It also displays total ETC and Actual hours associated with an assignment. User can further narrow their search by OBS Type & Path, Investment Type, Investment Charge Code, Investment Name, Task Name, Resource Name, Assignment Start Date and Assignment Finish Date. User can use exact dates or relative dates for Assignment Start and Finish Dates filter parameters.
  • Rego’s Clarity Adoption Metrics package consists of two sets of metrics: Project metrics, and Resource metrics. Project metrics measure how effectively project managers are using Clarity to manage their projects. Resource metrics measure how effectively resource managers are using Clarity to manage resources. Metrics are scored on a scale of 0 to 5, with higher scores indicating greater adoption and use. All metrics can be viewed numerically or graphically, and can be broken out by OBS. In addition, metric data can display as a 12-month rolling history to help identify trends. Project metrics can also display by lowest / highest adoption rates for a specific resource metric or all resource metrics. There is a variety of way to view the Adoption Metric data, therefore, Rego has made this simple by creating an Adoption Metrics object that contains multiple tabs.  Each tab displays one or more of the Project or Resource Adoption Metrics.  Based on the nature of the Metrics some tabs will allow the ability to use a pull down menu to select a specific Adoption Metric.   There is also a Metrics trending view that pulls monthly snapshots of the metrics. Project metrics consist of the following:
    • Project Status Reporting – Measures how well PMs create and publish project status reports.
    • Project Risk Adoption – Measures how well Risks are being used and managed.
    • Project Issue Adoption – Measures how well Issues are being used and managed.
    • Project Schedule – Measures how well PMs create tasks and keep the project schedule current.
    • Project Baseline – Measures whether or not baselines exist.
    • Project Zero ETC’s – Measures how well the PM assigns resources to tasks with ETCs.
    • Project Past ETC’s – Measures how many improperly scheduled tasks the PM has.
    • Project Milestone / Key Tasks – Measures how well PMs create and manage Milestones / Key Tasks.
    • Project Schedule Variance – Measures how effectively PMs manage their schedules.
    • Project Effort Variance – Measures how effectively PMs manage their project efforts.
    • Project Budget Variance – Measures how effectively PMs manage budgets or cost plans.
    • Project Unfilled Roles – Measures project roles with allocations that are already started or starting within the next 30 days.
    • Project Data Quality – Measures how effectively PMs complete the Description, Stage, Progress, Objective, and Sponsor/Business Owner fields.
    • Project Commitment – Measures the hard allocations for a project over a two week time frame.
    Resource Metrics consist of the following:
    • Resource Clarity Usage – Measures how often users log into Clarity.
    • Resource Timesheet – Measures if timesheets post in a timely manner.
    • Resource Allocation – Measures how well RMs keep total resource allocations within the expected range for future time periods.
    • Resource Actualy Utilization – Measures how well Resource allocations match actuals.
    • Resource Allocation Date in the Past – Measures how many resources are open for time entry with dates in the past.
    • Resource Data Quality – Measures how well RMs complete the Resource Manager and Primary Role fields and optionally the Skill and Employment Type fields.
    • Resource Commitment – Measures how much resource available time is committed to projects.
  • Rego’s Clarity Adoption Metrics package consists of two sets of metrics: Project metrics, and Resource metrics. Project metrics measure how effectively project managers are using Clarity to manage their projects. Resource metrics measure how effectively resource managers are using Clarity to manage resources. Metrics are scored on a scale of 0 to 5, with higher scores indicating greater adoption and use. All metrics can be viewed numerically or graphically, and can be broken out by OBS. In addition, metric data can display as a 12-month rolling history to help identify trends. Project metrics can also display by lowest / highest adoption rates for a specific resource metric or all resource metrics. There is a variety of way to view the Adoption Metric data, therefore, Rego has made this simple by creating an Adoption Metrics object that contains multiple tabs.  Each tab displays one or more of the Project or Resource Adoption Metrics.  Based on the nature of the Metrics some tabs will allow the ability to use a pull down menu to select a specific Adoption Metric.   There is also a Metrics trending view that pulls monthly snapshots of the metrics. Project metrics consist of the following:
    • Project Status Reporting – Measures how well PMs create and publish project status reports.
    • Project Risk Adoption – Measures how well Risks are being used and managed.
    • Project Issue Adoption – Measures how well Issues are being used and managed.
    • Project Schedule – Measures how well PMs create tasks and keep the project schedule current.
    • Project Baseline – Measures whether or not baselines exist.
    • Project Zero ETC’s – Measures how well the PM assigns resources to tasks with ETCs.
    • Project Past ETC’s – Measures how many improperly scheduled tasks the PM has.
    • Project Milestone / Key Tasks – Measures how well PMs create and manage Milestones / Key Tasks.
    • Project Schedule Variance – Measures how effectively PMs manage their schedules.
    • Project Effort Variance – Measures how effectively PMs manage their project efforts.
    • Project Budget Variance – Measures how effectively PMs manage budgets or cost plans.
    • Project Unfilled Roles – Measures project roles with allocations that are already started or starting within the next 30 days.
    • Project Data Quality – Measures how effectively PMs complete the Description, Stage, Progress, Objective, and Sponsor/Business Owner fields.
    • Project Commitment – Measures the hard allocations for a project over a two week time frame.
    Resource Metrics consist of the following:
    • Resource Clarity Usage – Measures how often users log into Clarity.
    • Resource Timesheet – Measures if timesheets post in a timely manner.
    • Resource Allocation – Measures how well RMs keep total resource allocations within the expected range for future time periods.
    • Resource Actualy Utilization – Measures how well Resource allocations match actuals.
    • Resource Allocation Date in the Past – Measures how many resources are open for time entry with dates in the past.
    • Resource Data Quality – Measures how well RMs complete the Resource Manager and Primary Role fields and optionally the Skill and Employment Type fields.
    • Resource Commitment – Measures how much resource available time is committed to projects.
  • Rego’s Clarity Adoption Metrics package consists of two sets of metrics: Project metrics, and Resource metrics. Project metrics measure how effectively project managers are using Clarity to manage their projects. Resource metrics measure how effectively resource managers are using Clarity to manage resources. Metrics are scored on a scale of 0 to 5, with higher scores indicating greater adoption and use. All metrics can be viewed numerically or graphically, and can be broken out by OBS. In addition, metric data can display as a 12-month rolling history to help identify trends. Project metrics can also display by lowest / highest adoption rates for a specific resource metric or all resource metrics. There is a variety of way to view the Adoption Metric data, therefore, Rego has made this simple by creating an Adoption Metrics object that contains multiple tabs.  Each tab displays one or more of the Project or Resource Adoption Metrics.  Based on the nature of the Metrics some tabs will allow the ability to use a pull down menu to select a specific Adoption Metric.   There is also a Metrics trending view that pulls monthly snapshots of the metrics. Project metrics consist of the following:
    • Project Status Reporting – Measures how well PMs create and publish project status reports.
    • Project Risk Adoption – Measures how well Risks are being used and managed.
    • Project Issue Adoption – Measures how well Issues are being used and managed.
    • Project Schedule – Measures how well PMs create tasks and keep the project schedule current.
    • Project Baseline – Measures whether or not baselines exist.
    • Project Zero ETC’s – Measures how well the PM assigns resources to tasks with ETCs.
    • Project Past ETC’s – Measures how many improperly scheduled tasks the PM has.
    • Project Milestone / Key Tasks – Measures how well PMs create and manage Milestones / Key Tasks.
    • Project Schedule Variance – Measures how effectively PMs manage their schedules.
    • Project Effort Variance – Measures how effectively PMs manage their project efforts.
    • Project Budget Variance – Measures how effectively PMs manage budgets or cost plans.
    • Project Unfilled Roles – Measures project roles with allocations that are already started or starting within the next 30 days.
    • Project Data Quality – Measures how effectively PMs complete the Description, Stage, Progress, Objective, and Sponsor/Business Owner fields.
    • Project Commitment – Measures the hard allocations for a project over a two week time frame.
    Resource Metrics consist of the following:
    • Resource Clarity Usage – Measures how often users log into Clarity.
    • Resource Timesheet – Measures if timesheets post in a timely manner.
    • Resource Allocation – Measures how well RMs keep total resource allocations within the expected range for future time periods.
    • Resource Actualy Utilization – Measures how well Resource allocations match actuals.
    • Resource Allocation Date in the Past – Measures how many resources are open for time entry with dates in the past.
    • Resource Data Quality – Measures how well RMs complete the Resource Manager and Primary Role fields and optionally the Skill and Employment Type fields.
    • Resource Commitment – Measures how much resource available time is committed to projects.
  • ** No Download - Do not Add to Cart ** As Clarity's Modern UX continues to evolve with each release, so has the transition conversation among Clarity Product Owners and Administrators. It's no longer a question of "if" and "when;" the question is, how? In this webinar, we'll explore some best practices that enable a successful shift from Classic to Modern. Through a collaborative discussion of overarching strategies to a step-by-step checklist, this session is designed to help you quickly position your users to take advantage of Clarity's latest and greatest capabilities. Nothing to Download - See Link below. http://info.regoconsulting.com/when-to-move-to-modernux-aug-2020
  • ** No Download - Do not Add to Cart ** Organizational metrics that support any Agile methodology Yes–it's possible. Join our Rego expert guides to learn about industry-proven Agile metrics as well as new ideas to measure success across multiple levels of your value stream Nothing to Download - See link below. http://info.regoconsulting.com/agile-metrics-july-2020
  • ** No Download - Do not Add to Cart ** Join Rego expert guide Dave Gubeno, Will Ross, and Chris Phillips for an engaging and informative webinar that will explain the definition, purpose, and development of Clarity metrics. Their discussion will also include: A description of the differences between metrics and key performance indicators An introduction to the Rego Adoption Metrics Framework lifecycle The presentation of pre-defined Rego Adoption Metrics for Projects and Resources An introduction to a set of Clarity portlets used to view the metrics http://info.regoconsulting.com/clarity-adoption-metrics-september-2020
  • ** No Download - Do not Add to Cart ** As the world’s largest advanced wastewater treatment plant operator, DC Water depends on a well-designed and comprehensive Project Management Office (PMO) to ensure that its 2.1 million customers have safe drinking water. In this webinar, you'll learn how DC Water joined with Rego to construct an award-winning, metrics-based PMO using Rego’s Clarity innovations. You’ll learn how their partnership resulted in a PMO that: - Drives effective Demand and Portfolio Management for IT projects and programs - Fosters real-time communication between Clarity and Microsoft 365 to keep DC Water’s Management team and Project Management community informed - Allows the IT PMO to measure progress on objectives through metrics ** No Download ** follow this link to sign up to view the recorded webinar - http://info.regoconsulting.com/how-dc-water-partnered-with-rego-march-2021
  • Today, most high-performing organizations recognize that moving from project-funding to product-funding is necessary for achieving business agility. What doesn't exist in the industry is guidance on how to support the transition from a tooling perspective. In this session, Rego Expert Guide Robert Sirard presents a practical and tactical approach to using Clarity's PPM software and Rally's Agile software together to plan, track, monitor, and deliver products. At Rego, we realize that not everything needs to be done in an Agile manner, so Robert will discuss how this approach also supports a mix of traditional and Agile investments. ** No Download - Do not Add to Cart ** There is no download for this content. Follow the link to view - http://info.regoconsulting.com/product-funding-clarity-rally-may-2021
  • This paper will help you launch a PMO—or facelift the one you’ve got—by making sure your PMO charter can handle strategic heavy lifting. It covers everything from getting stakeholder buy-in to achieving successful adoption throughout your organization. This White Paper is downloaded from the Rego Consulting site. You will be asked to provide your email address and current ppm tool.  - http://info.regoconsulting.com/launch-pmo-whitepaper ** No Download - Do not Add to Cart **
  • Finding the right project manager can be tricky. How do you know which candidates have the appropriate leadership, forecasting, and problem-solving skills? Interviewing strategies can make all the difference. This paper discusses important ways you can prepare for a project manager interview. It points out hazards to sidestep and best practices for identifying candidates with the right proficiency. This White Paper is downloaded from the Rego Consulting site. You will be asked to provide your email address and current ppm tool. - http://info.regoconsulting.com/how-to-hire-the-right-pm  ** No Download - Do not Add to Cart **
  • Rego’s course materials for managing projects with Clarity PPM.  This slide deck is created using Clarity version 15.6 and focuses on the Classic user interface.  The course material covers the following:
    • Project Management Overview
    • Managing Projects
    • Staff the Team
    • Work Breakdown Structure (WBS)
    • Resource Assignments to Tasks
    • Clarity PPM Autoschedule
    • Financial Management
    • Risks, Issues, and Change Requests
    • Controlling a Project
    • Program Management
    • Portlets and Reports
    • Clarity PPM New UX – Life of the PM Interface
  • Projects may need additional tasks from pre-existing templates for ease of use. When adding the tasks to the project, select any part of the template needed for your project. In this Quick Reference Guide, a project has already been created.
  • Clarity has the flexibility to manage your project throughout the project life cycle, adapting to changes, risks and issues proactively to minimize the impact to the project constraints. NOTE: The tabs displayed on a project are defined by the blueprint. Different projects may be on different blueprints, and therefore may have fewer, more or tabs in a different order.
  • A Quick Reference Card to assist as you configure the Task List under the Task Tab on the project.  You have the option to remove or add fields to the Task List.
  • A Quick Reference Card to assist in the creation of project level dependencies.  You can create dependency relationships that exist between investments in a portfolio using the dependencies page of project or program properties.  A dependency can occur when a task in an investment requires to be completed before a task in another investment can begin.
  • A Quick Reference Card to assist in the creation of Master-Subprojects in CA PPM.
  • A Quick Reference Card to assist in creating a project in CA PPM.  Reviews options of creating from New or New from Template.
  • A Quick Reference Card to assist in the creation of Program Milestones in CA PPM.  This can be done from the Tasks Tab or from the CA PPM Gantt.
  • A Quick Reference Card to assist in the creation of a Program.
  • A Quick Reference Card to assist in the adding of Subprojects to Programs.  Shows how add and remove from the Subprojects Subpage or from the Hierarchy Tab.
  • The Transaction Adapter – is a text based CSV file which automates the importing of monthly non labor financial data into Clarity directly from your financial system.  This integration eliminates the need to create non-labor transactions manually in Clarity and will provide more accurate project, program, and portfolio financial reporting.
  • The Project Status Summary report is a transaction based Jaspersoft report that does not require the Load Jaspersoft Datawarehouse job to be run.  The report will pull real-time data from the transaction tables in Clarity.  This report can be run from either the Advanced Reporting or Reports and Jobs area within Clarity. The Project Status Summary report displays summary information about a project, including current stage, overall status, key accomplishments, upcoming activities, the cost and amount of resources that are consumed, mapped risks indicating categories with a high number of risks, and a high-level Gantt chart displaying information about the project phases and key milestones.
  • All Skills report provides project managers a single place to view number of resources having a particular skill and its detailed information. This report contains a bar graph and a grid. Top Skills by Resource:  Bar graph that displays # of resources having a particular skill. Y- Axis represents various skills available in the system. Resource and Skill details grid:  Grid that displays information such as Skill, its parent skill, Skill path, Skill Description, Resource having that skill & his proficiency and interest level in that skill. You can further narrow your search by Parent Skills, Skills and Resource.
  • All Tasks report provides project managers a single place to view KPIs related to Tasks.  All the KPIs are depicted in various visualizations. Pending Actuals:  Scorecard that displays the # of Actuals that are still open and not yet posted. Average Days Old:  Scorecard that displays the average number of Task Days Old. Days Old is the difference between Task Finish date and Today’s Date (when Today’s Date > Task Finish date. In other cases, it is zero) Tasks by Finish Date: Column chart that displays # of Tasks by Year of Finish date. X axis display Calendar years. Data labels indicate the number of Tasks finish date within that year. Actuals by OBS level 2: Column chart that displays sum of Task Actuals by OBS level 2. X axis display OBS level2. Data labels indicate the Actuals within that OBS level2. Grid: Displays Risk details such as Project Name, Project Manager, Task Name, Task Status, Start Date, Finish Date, Days Late, Days Old, Actuals, ETC and Pending Actuals Days Late is the difference between Task Finish date and Baseline Finish Date (when Baseline Finish Date > Task Finish date. In other cases, it is zero) You can further narrow your search by OBS Type, OBS Path, Project(s) and Project Manager.
  • This Tech Trick walks you through the steps in CA PPM to make Bulk Role replacements on tasks.   Useful when you want to make the changes to the project template which has a large WBS structure, and a lot of role assignments to tasks.
  • Take your project task information straight from Excel right into CA PPM. Task Name, Start Date, Finish Date and Percent Complete can all be imported or updated directly.  Other fields can be added with a short Rego Consulting engagement.  Installation of the base app requires 10 hours of Rego Consulting engagement time. Since this item requires Rego staff and hours (see special instructions) to install, download items are informational only.  Install files will be utilized by Rego staff.
  • Many times Roles are spread out geographically or by function and these Roles will have different rates.  For example, a developer in India may charge $25/hour vs a Developer in US may charge $50/hour. When the project team has a requirement of several developers, the PM will have to add a region specific role (Developer-US, Developer-India) so that the right rates can be applied when a cost plan is created. This creates a challenge in terms of Resource Management. As the Demand and Capacity can be spread between different region specific roles. Proper configuration on the Rate Matrix can allow you to have one Role name but different rates based on Location or Department.  This allows greater flexibility and takes away the redundancy of Role Names.  You can do so with the Project Team Member Properties.
  • The Allow PM to Give Certain Rights modification allows the project manager to delegate rights (chosen by the administrator on the PM Rights object) on his or her projects. This modification eliminates the need for project managers to request additional rights through the PMO/management and simplifies the entire process for everyone involved. The system administrator is able to customize the PM Rights object to pick which rights should be granted to users by the process. The process begins when a change is made on the newly created “Grant / Revoke” field on the project object. The process will then grant or revoke (depending on what option is selected) any rights listed in the PM Rights object to the user in the “Assign PM Rights” field on the project object.