Projects within Baseline Finish – Pie with Drilldown – Postgres
Pie Chart displays projects by Baseline Finish Variance—is current project finish beyond baseline finish; or is current project finish on or before baseline finish. Filterable by OBS structure and Finish Date range. Data labels show percent within baseline vs percent outside baseline. Mouse-over shows Within or Outside label and percent of total projects. Legend shows color coded Within Baseline and Outside Baseline labels. Drilldown: Clicking on a pie slice yields a grid portlet of projects either Within or Outside Baseline.
Download Details
RegoXchange Content ID: EX1090
Submission Date:
Submitter:
Content Type: Clarity Studio
Related Modules: Project Management
Company: Rego Consulting
Version Support
Versions Supported: 15.x, 16.x+
Special Instructions
Special Instructions: Please note that the appropriate rights need to be specified against the portlets and pages if users do not have global rights to see all. If portlets and page rights are instance based please grant instance rights to both portlets in this package as well as the page in which the drilldown portlet sits on.