Projects within Baseline Finish – Pie with Drilldown – Postgres

Pie Chart displays projects by Baseline Finish Variance—is current project finish beyond baseline finish; or is current project finish on or before baseline finish.  Filterable by OBS structure and Finish Date range.  Data labels show percent within baseline vs percent outside baseline.  Mouse-over shows Within or Outside label and percent of total projects.  Legend shows color coded Within Baseline and Outside Baseline labels.  Drilldown:  Clicking on a pie slice yields a grid portlet of projects either Within or Outside Baseline.

Want access to our solutions?

Register for a free theBasiX™  account and upgrade to theWorX to gain access to all of the content available on RegoXchange™.

Download Details

RegoXchange Content ID: EX1090

Submission Date:

Submitter:

Content Type: Clarity Studio

Related Modules: Project Management

Company: Rego Consulting

Version Support

Versions Supported: 15.x, 16.x+

Special Instructions

Special Instructions: Please note that the appropriate rights need to be specified against the portlets and pages if users do not have global rights to see all.   If portlets and page rights are instance based please grant instance rights to both portlets in this package as well as the page in which the drilldown portlet sits on.