Projects within Baseline Finish – Pie with Drilldown – SQL

Pie Chart displays projects by Baseline Finish Variance—is current project finish beyond baseline finish; or is current project finish on or before baseline finish.  Filterable by OBS structure and Finish Date range.  Data labels show percent within baseline vs percent outside baseline.  Mouse-over shows Within or Outside label and percent of total projects.  Legend shows color coded Within Baseline and Outside Baseline labels.  Drilldown:  Clicking on a pie slice yields a grid portlet of projects either Within or Outside Baseline.

Want access to our solutions?

Register for a free theBasiX™  account and upgrade to theWorX to gain access to all of the content available on RegoXchange™.

Download Details

RegoXchange Content ID: EX1090

Submission Date:

Submitter:

Content Type: Clarity Studio

Related Modules: Project Management

Company: Rego Consulting